---
title: Lockout Tagout Sequence| LO/TO | Equipment Safety | DuraLabel
description: "\"Sample LO/TO Sequence\""
image: https://website-integration-test-graphicproducts-21537593.hs-sites.com/hubfs/Imported_Blog_Media/lockout-tagout-infographic-1-1-1-1-1-1-1.jpg
---

[Skip to content](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/sample-lockout-sequence#main-content)

- [Home](https://www.duralabel.com/)
- >
- [Resources](http://website-integration-test-graphicproducts-21537593.hs-sites.com/resources)
- >
- [Infographics](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics)
- >
- Sample LO/TO Sequence

# Sample LO/TO Sequence

**Updated on:** October 4, 2024  1 MINUTE READ **Published on:** Feb 03, 2023

Procedures for Lockout/Tagout, or LO/TO, are critical elements of a safe approach to equipment maintenance or service. Each year, many workers are injured or killed on the job due to a failure to [properly lock out equipment](http://website-integration-test-graphicproducts-21537593.hs-sites.com/guides/lockout-tagout-loto) before work.

Violations of OSHA's [LO/TO rules](http://website-integration-test-graphicproducts-21537593.hs-sites.com/articles/lockouttagout-loto-procedures) have been one of the [ten most frequent citations](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/top-10-osha-violations-of-2020/) nationwide for the last five years. This infographic will help you kick start a compliant plan for your facility, avoid fines and save lives.

 

![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hubfs/Imported_Blog_Media/lockout-tagout-infographic-1-1-1-1-1-1-1.jpg)

*The following is a transcript of the Sample Lockout Sequence Infographic:*

## Lockout/Tagout

**Sample Lockout Sequence**

Before servicing equipment that could cause injury if it started up without warning, turn it off, shut down the power, and keep it off until the service is done. That's lockout/tagout (LO/TO) in a nutshell. This example sequence shows a step-by-step LO/TO process that can be easily adapted for any equipment in your facility.

## LOCKING OUT EQUIPMENT

**Before starting service on equipment:**

1. Notify all affected employees that the equipment will be locked out
2. Identify all energy types and sources in use
3. Shut down the equipment normally
4. Isolate the equipment from its energy sources
5. Lock out the energy isolating devices
6. Remove or restrain any remaining energy
7. Confirm that the equipment is unpowered

**Now that the equipment is locked out, you can begin service.**

## RETURNING TO NORMAL WORK:

**Once the service work is done, but before resuming normal work:**

1. Check the equipment and area for loose parts or tools
2. Make sure all workers are in safe places
3. Verify that the equipment controls are in "off" or "neutral"
4. Remove lockout devices and reconnect energy sources
5. Notify all affected employees that the equipment will be starting up again
6. LO/TO procedure is complete; normal work may resume

 

 

![Facility Signage Handbook](https://21057378.fs1.hubspotusercontent-na1.net/hub/21057378/hubfs/Imported%20sitepage%20images/facility-signage-handbook-spread.png?width=1200&length=1200&name=facility-signage-handbook-spread.png)

## Get Your Free Facility Signage Handbook

Create effective facility signage to improve safety, communication, and regulatory compliance.

[ Download Guide 

](https://resources.duralabel.com/guides/facility-signage-handbook)

![OSHA Quick Start Guide](https://21057378.fs1.hubspotusercontent-na1.net/hub/21057378/hubfs/QSG-OSHA_Signage-Guide-Spread.png?width=1800&length=1325&name=QSG-OSHA_Signage-Guide-Spread.png)

## Get Your Free OSHA Quick Start Guide

Stay compliant with OSHA regulations and improve safety with essential tips and strategies.

[ Download Guide 

](https://resources.duralabel.com/guides/osha-instant-action-guide)

![](https://21057378.fs1.hubspotusercontent-na1.net/hub/21057378/hubfs/Imported%20images/DuraNews_Logo_White_Reverse.png?width=500&name=DuraNews_Logo_White_Reverse.png)

**Like this article?** Subscribe to DuraNews for our monthly safety newsletter!

---

##### Related Resources

[![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hubfs/Imported_Blog_Media/osha_infographic-final-2020-1-1-1-1-1-1-1.jpg)

#### OSHA Improving Worker Safety

The following is a transcript of the OSHA Improvement of Worker Safety infographic: OSHA Improvement of ... 

Read 

](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/osha-improvement-of-worker-safety) [![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hubfs/Imported_Blog_Media/DuraLabel-Heat_Stress_Infographic-8-6-2024-3.png)

#### Heat Stress: Symptoms, First Aid, & Prevention

Millions of U.S. workers are exposed to heat elements in their workplace each year. Hazardous heat exposure ... 

Read 

](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/heat-stress-symptoms-first-aid-prevention) [![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hubfs/Imported_Blog_Media/near-miss-reporting-1200-infographic-1-1-1-1-1-1-2.png)

#### Near-Miss Reporting

The following is a transcript of the Near-Miss Reporting Infographic: Near-Miss Reporting Keep workers safe, ... 

Read 

](http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/near-miss-reporting)

---

##### get started

[![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hs-fs/hubfs/print.jpeg?width=1200&length=1200&name=print.jpeg)](https://duralabel.com/labeling-and-signage/industrial-label-printers/all-industrial-printers)

## Print Your Own Signs

[![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hs-fs/hubfs/label.png?width=1200&length=1200&name=label.png)](https://op.duralabel.com/labelforge-pro)

## Free Label Design Software

[![](https://website-integration-test-graphicproducts-21537593.hs-sites.com/hs-fs/hubfs/danger.png?width=1200&length=1200&name=danger.png)](https://duralabel.com/samples/)

## Free Labeling Samples

×

```json
{
  "@context" : "https://schema.org",
  "@type" : "Organization",
  "address" : {
    "@type" : "PostalAddress",
    "addressCountry" : "US",
    "addressLocality" : "Beaverton",
    "addressRegion" : "OR",
    "postalCode" : "97005",
    "streetAddress" : "9825 SW Sunshine Court"
  },
  "contactPoint" : {
    "@type" : "ContactPoint",
    "contactType" : "Customer Service",
    "telephone" : "+1-800-788-5572"
  },
  "email" : "info@graphicproducts.com",
  "logo" : "https://cdn11.bigcommerce.com/s-3pbmh1zmv/images/stencil/374x128/output-onlinepngtools_1693428260__15657.original.png",
  "name" : "DuraLabel",
  "sameAs" : [ "https://www.facebook.com/duralabelgraphicproducts", "https://x.com/DuraLabelbyGP", "https://instagram.com/duralabel/", "https://www.youtube.com/@DuraLabelbyGP", "https://www.linkedin.com/company/duralabel-by-graphic-products/", "https://www.pinterest.com/duralabelbygp/", "https://www.graphicproducts.com/" ],
  "url" : "https://resources.duralabel.com/"
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "BreadcrumbList",
  "itemListElement" : [ {
    "@type" : "ListItem",
    "item" : "https://www.resources.duralabel.com/",
    "name" : "Home",
    "position" : 1
  }, {
    "@type" : "ListItem",
    "item" : "https://www.resources.duralabel.com/resources",
    "name" : "Resources",
    "position" : 2
  }, {
    "@type" : "ListItem",
    "item" : "https://www.resources.duralabel.com/Infographics",
    "name" : "Infographics",
    "position" : 3
  }, {
    "@type" : "ListItem",
    "item" : "http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/sample-lockout-sequence",
    "name" : "Sample LO/TO Sequence",
    "position" : 4
  } ]
}
```

```json
{
  "@context": "https://schema.org",
  "@type": "Article",
  "headline": "Lockout Tagout Sequence| LO/TO | Equipment Safety | DuraLabel",
  "wordCount": 215,
  "mainEntityOfPage": {
    "@type": "WebPage",
    "@id": "http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/sample-lockout-sequence"
  },
  "image": ["https://21537593.fs1.hubspotusercontent-na1.net/hubfs/21537593/Imported_Blog_Media/lockout-tagout-infographic-1-1-1-1-1-1-1.jpg"],
  "datePublished": "2023-02-03T05:00:00-07:00",
  "dateModified": "2024-10-04T10:15:07-07:00",
  "description": ""Sample LO/TO Sequence"",
  "publisher": {
    "@type": "Organization",
    "name": "Duralabel"
  },
  "author": {
    "@type": "Person",
    "name": "DuraLabel Staff",
    "url": "http://website-integration-test-graphicproducts-21537593.hs-sites.com/infographics/author/duralabel-staff"
  }
}
```